Search results

  1. C

    Prototype Needed Smalls parts for prototype than production

    1) Stainless Steel 2) Material not supplied 3) 2 pieces for prototype and pricing for quantities in 100,200, and 500 4) Full specs are not listed in drawings. They are available though. 5) 2-3 weeks 6) End of Feb 2009 7) Email mrjake22@gmail.com 9) Brushed or polished no sharp edges.
  2. C

    Milling work

    1) Copper 110 alloy 2) You supply material 3) 10 for a prototype. Will be ordering in 50-100 batch quantities on a regular basis. 4) Check drawings for specs. All measurements are in MM. Tolerances .75mm would be fine. If you cant do that email me and we might beable to work something out...
  3. C

    Forge Work

    1) Copper 110 alloy 2) You supply material 3) 10 for a prototype. Will be ordering in 50-100 batch quantities on a regular basis. 4) Check drawings for specs. All measurements are in MM. Tolerances .75mm would be fine. If you cant do that email me and we might beable to work something out...
  4. C

    6061 Milling work

    1) 6061 Alu 2) Material Supplied by you 3) 2 for prototype up to 10 more in the near future 4) Check drawings for specs. Tolerances are +-.001in Any questions email me. This does need to be 1 solid piece 5) 4 weeks 6) 30 days 7) mrjake22@gmail.com 8) The 4 holes need to be tapped with 6-32...
  5. C

    Simple Stainless Steel Pieces

    1) Stainless Steel 1/16 inch thick 2) Material supplied by you 3) 4 of each 4) Check drawings for specs in MM. Tolerances are +- .1mm 5) 2 weeks 6) 20 days 7) mrjake22@gmail.com 8) Edges must not be sharp Solidworks part files are available upon request. On both the 8 small holes are 2-62 or...
  6. C

    Simple Alum Piece

    1) Aluminum 6061 2) Material supplied by you 3) 5 pieces 4) See drawings for specs. .01mm tolerances. (the holes should be tapped with 6-32 thread) All measurements are in mm. The two holes that are 90mm apart are centered. 5) 2-4 weeks 6) End of May 7) mrjake22@gmail.com 8) The surfaces...
  7. C

    RFQ Turning work.

    RFQ for two of these to be made. I will supply 1 12 inch piece long 2.75 inch diameter of Copper 110 alloy. Tolerances are .001. I need the bottom base to be perfectly flat.
  8. C

    RFQ Forge work

    I need two of these made out of copper. 110 should be ok as I will be using it for heat transfer. You supply the material. Tolerances are .01. The bottom base needs to be perfectly flat which would probably need to be touched up with a machine after casting. PDF is attached. I can include...
  9. C

    RFQ on Turning work

    I need a quote on this part. Tolerances are .01in on the inside and .01 on outside. The bottom circle at the end of the chamfer needs to be .001 flat as well. It needs to be as perfectly flat as possible. 1)Copper 2) I will provide 1 piece 2.75" diam 12" long 3) Quantity:2 Any other...
  10. C

    RFQ Milling Work

    1) Aluminum 2) Material Required 3) 6-10 4) See Drawings 5) 1 month 6) No end 7) mrjake22@gmail.com The one piece that protrudes needs to be kept fairly flat with minimal defects. Tolerances are .01 inches. The drawing is in inches. I forgot to includeo n the drawing that the hole is 5.43...
  11. C

    Aluminum Turning - Container

    Material - 6061 Aluminum you supply it Quantity - 5 Drawings - Attached PDF. I can email the solid works files or catia files Time frame - 1 month Tolerances arent really to tight on this piece .01 of an inch. The base or bottom of the container does need to be pretty flat with minimial...
  12. C

    RFQ Alumnium Containers

    1) 6061 Aluminum 3 inch round stock 2) Material supplied 3) 5-10 pieces 4) would need it in a a month to two months I know the tolerances on the drawing are super strict but they realy dont have to be that close. Sorry about the crappy drawings. I just learned some basic CATIA on my own.
Top