danrmcgee
New Member
Hello All,
I have a quick turn around project that I am looking for some help on.
This is a pedestal for another project, there 4 pieces to 1 pedestal. I need 4 pedestals made (total of 16 individual pieces).
3" Aluminum Tube 1/8 wall (any alloy) (you supply material).
All of tubes will slip fit into a mate, so this requires cutting an outside shoulder and an inside shoulder on each connection.
Each connection then has a hole drilled through it (for a spring button) the hole location is not critical as long as it is the same all the way through the connection (so the shoulder sits tight together)
View attachment Pedestal 4.pdf
View attachment Pedestal 3.pdf
View attachment Pedestal 2.pdf
View attachment Pedestal 1.pdf
I need to have the finished part in my office on 4-6-16
I have a quick turn around project that I am looking for some help on.
This is a pedestal for another project, there 4 pieces to 1 pedestal. I need 4 pedestals made (total of 16 individual pieces).
3" Aluminum Tube 1/8 wall (any alloy) (you supply material).
All of tubes will slip fit into a mate, so this requires cutting an outside shoulder and an inside shoulder on each connection.
Each connection then has a hole drilled through it (for a spring button) the hole location is not critical as long as it is the same all the way through the connection (so the shoulder sits tight together)
View attachment Pedestal 4.pdf
View attachment Pedestal 3.pdf
View attachment Pedestal 2.pdf
View attachment Pedestal 1.pdf
I need to have the finished part in my office on 4-6-16