We need a small batch to test, later leading to a larger order. Please quote the attached drawing and advise if there is an issue with any of the tolerances.
Shop supplied material: bearing grade Bronze (SAE660)
quote1: 80 each
desired lead time: under 1 week
quote2: 4000 each
desired lead time: 4 weeks
Thank you.
VK
Shop supplied material: bearing grade Bronze (SAE660)
quote1: 80 each
desired lead time: under 1 week
quote2: 4000 each
desired lead time: 4 weeks
Thank you.
VK
Attachments
Last edited: