Sirs:
I have inserted my RFQ here as I have one of 3 parts that can be machined or molded from most any rigid plastic with good durability. I would like the bidder to also shoot 1000 parts to start, and quote the steel parts if possible:
- - -
Please quote 1, 2 , or all 3 of the attached parts:
1. A small eccentric axle of free-turning ss or steel, you supply. One end a plain shaft and one end #10-32 UNF - relief cut OK at base and screwdriver or allen hole on end. Small shoulder for bearing clearance. Flange may be on either end of eccentric. There *may* be a shallow spot drill to aid in swaging over the head in assembly (will delete if possible or costly). Pls quote 500, 1000, 2000.
2. A similar axle, no eccentric. Pls quote 500, 1000, 2000.
3. A plastic wheel of delrin, nylon, or similar rigid plastic, you supply. May machine or mold, and will entertain tooling. Pls quote 500, 1000, 2000.
All parts to be part of a standard assembly to be repeated. Manufacturability changes welcome. Will entertain higher quantities for cost savings. Delivery time not critical; RFQ open about 2 weeks, pls. On-time payer.
Gregg Carlson
gregg.carlson@gmail.com
Tulsa, OK
I have inserted my RFQ here as I have one of 3 parts that can be machined or molded from most any rigid plastic with good durability. I would like the bidder to also shoot 1000 parts to start, and quote the steel parts if possible:
- - -
Please quote 1, 2 , or all 3 of the attached parts:
1. A small eccentric axle of free-turning ss or steel, you supply. One end a plain shaft and one end #10-32 UNF - relief cut OK at base and screwdriver or allen hole on end. Small shoulder for bearing clearance. Flange may be on either end of eccentric. There *may* be a shallow spot drill to aid in swaging over the head in assembly (will delete if possible or costly). Pls quote 500, 1000, 2000.
2. A similar axle, no eccentric. Pls quote 500, 1000, 2000.
3. A plastic wheel of delrin, nylon, or similar rigid plastic, you supply. May machine or mold, and will entertain tooling. Pls quote 500, 1000, 2000.
All parts to be part of a standard assembly to be repeated. Manufacturability changes welcome. Will entertain higher quantities for cost savings. Delivery time not critical; RFQ open about 2 weeks, pls. On-time payer.
Gregg Carlson
gregg.carlson@gmail.com
Tulsa, OK