blurrycustoms
Member
We need a quote for a run of 10,000pcs of the attached drawing:
Material: https://www.mcmaster.com/#8576k12/=19gdbzs - Delrin - Black
-If the above material is used, the OD of the part does not need to be turned.
QTY: 10,000pcs
RFQ Ends: 9/30/2017
Project start timeline is 2-3 months if accepted, possibly sooner.
Provide price including the material. We are only offering this project to a shop in the United States.
Material: https://www.mcmaster.com/#8576k12/=19gdbzs - Delrin - Black
-If the above material is used, the OD of the part does not need to be turned.
QTY: 10,000pcs
RFQ Ends: 9/30/2017
Project start timeline is 2-3 months if accepted, possibly sooner.
Provide price including the material. We are only offering this project to a shop in the United States.