1) Material type - Aluminum. Doesn't matter what kind. Whatever is cheapest
2) Is a material quote required or is material supplied - Include material in quote
3) Quantity - (4)
4) Drawings should be immediately available or necessary specs. - I have 2D and 3D drawings of this part. Email me for them.
5) Required time frame - 2-3 weeks
6) RFQ ending time - bid closes 5-15-09
These are center caps. Parts to be turned, then Anodized black, then the logo machined into the face.
3D render:
email quotes to jesscneal@yahoo.com
Thanks!
Jess
2) Is a material quote required or is material supplied - Include material in quote
3) Quantity - (4)
4) Drawings should be immediately available or necessary specs. - I have 2D and 3D drawings of this part. Email me for them.
5) Required time frame - 2-3 weeks
6) RFQ ending time - bid closes 5-15-09
These are center caps. Parts to be turned, then Anodized black, then the logo machined into the face.
3D render:
email quotes to jesscneal@yahoo.com
Thanks!
Jess