I am currently making these parts, but am running short on machine time. I would like to get some quotes to see if it is worth having someone else make them.
I will only consider shops that can show me examples of previous work, and tell me something about their shop. I will only award the job to a shop that I can verify the business.
Please send quote in the body of the email. I will not open attachments until the job is awarded. Send quotes to prdinquiry@gmail.com
Thank you for taking the time to review my RFQ.
1) Material type 6061-T6
2) Is a material quote required or is material supplied. Material Quote required
3) Quantity: Please quote 25, 100, and 250
4) Drawings should be immediately available or necessary specs. Included print is very basic for quoting purposes.
5) Required time frame No important. Would like re-orders to be within 2-3 weeks. Please specify normal lead times.
6) RFQ ending time: Quotes will not be accepted after 8/24/09 if prices are good, job will be awarded on the 28th.
9) Make known any special treatments/finishes not necessarily related to the machining process. This a cosmetic part that will be anodized a very bright color, so ALL blems will be seen. Please quote job accordingly. The surface finish needs to be nice with no chatter, or scuffing from handling. All edges need to be machine chamfered.
I will only consider shops that can show me examples of previous work, and tell me something about their shop. I will only award the job to a shop that I can verify the business.
Please send quote in the body of the email. I will not open attachments until the job is awarded. Send quotes to prdinquiry@gmail.com
Thank you for taking the time to review my RFQ.
1) Material type 6061-T6
2) Is a material quote required or is material supplied. Material Quote required
3) Quantity: Please quote 25, 100, and 250
4) Drawings should be immediately available or necessary specs. Included print is very basic for quoting purposes.
5) Required time frame No important. Would like re-orders to be within 2-3 weeks. Please specify normal lead times.
6) RFQ ending time: Quotes will not be accepted after 8/24/09 if prices are good, job will be awarded on the 28th.
9) Make known any special treatments/finishes not necessarily related to the machining process. This a cosmetic part that will be anodized a very bright color, so ALL blems will be seen. Please quote job accordingly. The surface finish needs to be nice with no chatter, or scuffing from handling. All edges need to be machine chamfered.