Request For Quote- Fast delivery required 2 parts (6 of each)

Status
Not open for further replies.
I have 2 parts that I need delivered to me by 3/25. I do not need them plated just machined. I have attached the drawings, I will accept quotes until 5pm 3/25 and will issue P.O. 3/26 in the morning. Drawings attached.
 

Attachments

  • 09074-0221.PDF
    129.7 KB · Views: 95
  • 09074-0222.PDF
    127.3 KB · Views: 69
P.O. Issued

Thank you to everyone for your Quotes. I will be issuing a P.O. to a member from here this morning. I will be following up in a few weeks on a very large RFQ.
 
Status
Not open for further replies.
Top