Peter Ruggiero
New Member
1) Material type: G10/G11/FR4 (machine shop's choice)
2) Is a material quote required or is material supplied: Material will need to be supplied by the shop
3) Quantity: Please quote 5, 10, 50 and 100
4) Drawings should be immediately available or necessary specs: See attached
5) Required time frame: Need 5 in next 30-45 days
6) RFQ ending time: 12/6 End of business
2) Is a material quote required or is material supplied: Material will need to be supplied by the shop
3) Quantity: Please quote 5, 10, 50 and 100
4) Drawings should be immediately available or necessary specs: See attached
5) Required time frame: Need 5 in next 30-45 days
6) RFQ ending time: 12/6 End of business