Hello, I have two models that need two quotes.
First quote is for a small quantity I will use for prototyping. Shop supplied material (Billet / Sheet AL6061)
Clamp 2L Side 6 each
Clamp 2L Hinge 12 each
Desired lead time: under two weeks
_ _ _ _ _
Second quote is for the production run. I will provide extruded profiles for both componens (AL6061).
Clamp 2L Side 800 each
Hinge 2L Hinge 1600 each
Desired lead time: under 6 weeks
NOTES: linear tolerances are +-.005" from models, +-.003" on each continuing part, 2X 4-40 threaded holes on each "Clamp 2L Side" (see .089" hole in the model)
Prototyping run will be initiated within 10 days. Production is expected to start in 6 weeks.
Please feel free to PM or post any questions you may have.
Thank you.
View attachment Clamp 2L.zip
First quote is for a small quantity I will use for prototyping. Shop supplied material (Billet / Sheet AL6061)
Clamp 2L Side 6 each
Clamp 2L Hinge 12 each
Desired lead time: under two weeks
_ _ _ _ _
Second quote is for the production run. I will provide extruded profiles for both componens (AL6061).
Clamp 2L Side 800 each
Hinge 2L Hinge 1600 each
Desired lead time: under 6 weeks
NOTES: linear tolerances are +-.005" from models, +-.003" on each continuing part, 2X 4-40 threaded holes on each "Clamp 2L Side" (see .089" hole in the model)
Prototyping run will be initiated within 10 days. Production is expected to start in 6 weeks.
Please feel free to PM or post any questions you may have.
Thank you.
View attachment Clamp 2L.zip