I've attached a drawing of the bolt sleeve needed. Please note the tolerances. I need a quantity of 10 within 3 weeks of award. Another 200 will be needed for production in the near future (exact start date unknown). I may award each quantity separately but I would prefer to work with the same company all the way through. Tube is an acceptable feedstock. If tubing is available with the required dimensions AND tolerances just cut it to length.
1) Material type
18-8 Stainless or 304 Stainless
2) Is a material quote required or is material supplied.
Material will not be supplied
3) Quantity
10, 200
4) Drawings should be immediately available or necessary specs.
Attached
5) Required time frame
3 weeks or sooner for quantity 10
4 weeks ARO for quantity 200
6) RFQ ending time
3 days: Ending on Friday, February 13th, 2009 4:30PM PST
9) Make known any special treatments/finishes not necessarily related to the machining process.
All edges should be deburred and broken
1) Material type
18-8 Stainless or 304 Stainless
2) Is a material quote required or is material supplied.
Material will not be supplied
3) Quantity
10, 200
4) Drawings should be immediately available or necessary specs.
Attached
5) Required time frame
3 weeks or sooner for quantity 10
4 weeks ARO for quantity 200
6) RFQ ending time
3 days: Ending on Friday, February 13th, 2009 4:30PM PST
9) Make known any special treatments/finishes not necessarily related to the machining process.
All edges should be deburred and broken